Major project cancellations
Costs spiraling out of control
Throwing in the towel, quitting the deals
Grid overloaded cannot connect already built turbines
Years long interconnect problems, thousands built and no connection to grid is possible
Green energy government mandated central planning politics created this mess, as in Biden's push to all electric everything.
Siemens says 30% at least of installed turbines are defective and potentially dangerous, and they are the main supplier of these things.
Costs spiraling out of control
Throwing in the towel, quitting the deals
Grid overloaded cannot connect already built turbines
Years long interconnect problems, thousands built and no connection to grid is possible
Green energy government mandated central planning politics created this mess, as in Biden's push to all electric everything.
Siemens says 30% at least of installed turbines are defective and potentially dangerous, and they are the main supplier of these things.
Last edited: