Seriously awful? Big projects getting cancelled, delayed?
Siemens says 30% of installed turbines are defective and dangerous, must be replaced.
Very difficult to move the power to where needed.
There are problems, plus I was wondering why whale deaths are up and I think is due to the noises the turbines make.
However, they do seem to be going ahead with these regardless.
Siemens says 30% of installed turbines are defective and dangerous, must be replaced.
Very difficult to move the power to where needed.
There are problems, plus I was wondering why whale deaths are up and I think is due to the noises the turbines make.
However, they do seem to be going ahead with these regardless.
Last edited: